Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2017, 10:48 AM
  • 05 1288_05 1287_4272017_050213.mp4

Date
04/27/2017
W/O
0624558
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00453
PipeID
P06501
Time
3:48 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0507
Sewer Name
05 GRAMERCY PLACE TRUNK, SECTION 1
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Capital Improvement Program Assesment
Project
20170427MDM_GRAMERCY_PLACE_TRUNK_SECTION_1
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
05 1288
Downstream MH
05 1287
Dir. of Survey
Downstream
Length Surveyed
505.4 ft.
Total Length
505.4 ft.
Structural Index
3
Structural Quick
3623
Structural Rating
24
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole 05 1288 to 05 1287
MH: 05 1288MH: 05 1287downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:05AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC43.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE46.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC160.6 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG191.1 ft. MWL - Water Level, 20 %of cross sectional area191.1 ft. MWM - Water Mark, 30 %of cross sectional area267.2 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG369.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC369.8 ft. MWL - Water Level, 40 %of cross sectional area369.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE369.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC369.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE369.8 ft. MWM - Water Mark, 50 %of cross sectional area481 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG505.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE505.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC505.4 ft. AMH - Downstream Manhole, Survey Ends - 5:35AM

Observation photos (9)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    43.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    46.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    160.6 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    267.2 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    369.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    369.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    481 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (21)

DistanceCodeObservation
0MWM
46.7SAVSEVERE AGG SPORATIC
2SSSBLISTERING PEELING CONCRETE
369.8SAVSEVERE AGG SPORATIC
505.1SSSBLISTERING PEELING CONCRETE
369.8MWL
369.8SSSBLISTERING PEELING CONCRETE
481SAVSEVERE AGG
505.1SAVSEVERE AGG SPORATIC
369.8SAVSEVERE AGG SPORATIC
191.1MWL
0AMH5:05AM
2SAVSEVERE AGG SPORATIC
160.6SAVSEVERE AGG
369.8SSSBLISTERING PEELING CONCRETE
43.3SSSBLISTERING PEELING CONCRETE
505.4AMH5:35AM
369.8MWM
191.1MWM
0MWL
267.2SAPSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2017-04-27T03:48:30-07:00
documentation
MARTIN,REVELES,OLIVER 111
is_lateral_inspection
false