Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 25, 2017, 08:37 AM
  • B 0200_B 0199_4252017_020506.mp4

Date
04/25/2017
W/O
0624585
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00076
PipeID
P08697
Time
1:37 AM
Certificate
U-104-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0504
Sewer Name
B JOINT OUTFALL B - UNIT 1D RELIEF
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Routine Assessment
Project
20170424MDM_JOINT_OUTFALL_B_UNIT_1D_RELIEF
Material
Reinforced Concrete Pipe
Shape
Circular
Height
45 in.
Upstream MH
B 0200
Downstream MH
B 0199
Dir. of Survey
Downstream
Length Surveyed
786.6 ft.
Total Length
786.6 ft.
Structural Index
2
Structural Quick
3224
Structural Rating
14
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole B 0200 to B 0199
MH: B 0200MH: B 0199downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:05AM0 ft. MGO - General Observation - MAG COAT 60% START 8:00 TO 4:000 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING CONCRETE16.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6", 6" - Capped36.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start112.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Capped113.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLACKING CONCRETE356.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE553.5 ft. SAP - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG553.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active641.2 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG676.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - FLAKLING CONCRETE786 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish786 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING ,FLAKING CONCRETE786 ft. MGO - General Observation - MAG COAT 60% FINISH786.6 ft. AMH - Downstream Manhole, Survey Ends - 3:05AM

Observation photos (8)

  • General Observation - MAG COAT 60% START 8:00 TO 4:00

    0 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING CONCRETE

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    36.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLACKING CONCRETE

    113.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLACKING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE

    356.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE

  • Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG

    553.5 ft. - Surface Aggregate Projecting, from 08 to 09 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    641.2 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - FLAKLING CONCRETE

    676.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - FLAKLING CONCRETE

Observations (18)

DistanceCodeObservation
641.2SAVSEVERE AGG
16.6TFCCapped
36.3DAGS
676.3SSSFLAKLING CONCRETE
786.6AMH3:05AM
553.5SAPSEVERE AGG
2SSSBLISTERING,FLAKING CONCRETE
113.9SSSFLACKING CONCRETE
0AMH2:05AM
553.5TFActive
356.4SSSFLAKING CONCRETE
0MGOMAG COAT 60% START 8:00 TO 4:00
786DAGS
112.6TFCCapped
0MWM
0MWL
786SSSBLISTERING ,FLAKING CONCRETE
786MGOMAG COAT 60% FINISH

Properties (6)

custom_field_three
BLISTERING ,FLAKING CONCRETE
custom_field_two
4
customer
LACSD
datetime
2017-04-25T01:37:10-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false