Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 6, 2017, 08:00 PM
  • 01 0108_01 0107_762017_130730.mp4

Date
07/06/2017
W/O
PENDING
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00203
PipeID
P01172
Time
1:00 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7455
Sewer Name
01 COMPTON CREEK EXTENSION TRUNK, SECTION 1
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
15
Purpose
Maintenance Related
Project
20170706DF_COMPTON_CREEK_EXT_TR_SEC_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
01 0108
Downstream MH
01 0107
Dir. of Survey
Downstream
Length Surveyed
336.2 ft.
Total Length
336.2 ft.
Structural Index
4
Structural Quick
5432
Structural Rating
28
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
28
Pipe schematic from manhole 01 0108 to 01 0107
MH: 01 0108MH: 01 0107downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:01 PM0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start116.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open118.7 ft. B - Broken, from 08 to 12 o'clock, within 8 inches of joint: YES134.1 ft. MGP - General Photograph154.9 ft. B - Broken, from 07 to 12 o'clock, within 8 inches of joint: YES216.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"218.5 ft. B - Broken, from 07 to 12 o'clock, within 8 inches of joint: YES315.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"318 ft. B - Broken, from 09 to 04 o'clock, within 8 inches of joint: YES332.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.4 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336.2 ft. AMH - Downstream Manhole, Survey Ends - 1:29 PM336.2 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (7)

  • Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 08 to 12 o'clock, within 8 inches of joint: YES

    118.7 ft. - Broken, from 08 to 12 o'clock, within 8 inches of joint: YES

  • General Photograph

    134.1 ft. - General Photograph

  • Broken, from 07 to 12 o'clock, within 8 inches of joint: YES

    154.9 ft. - Broken, from 07 to 12 o'clock, within 8 inches of joint: YES

  • Broken, from 07 to 12 o'clock, within 8 inches of joint: YES

    218.5 ft. - Broken, from 07 to 12 o'clock, within 8 inches of joint: YES

  • Broken, from 09 to 04 o'clock, within 8 inches of joint: YES

    318 ft. - Broken, from 09 to 04 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
2SSSC
0MWL
2CM
154.9B
315.7TFC
2CM
134.1MGP
116.6TFOpen
332.4CM
118.7B
0AMH1:01 PM
0MWM
336.2AMH1:29 PM
218.5B
318B
332.4CM
332.4SSSC
216.3TFC
0MGOConn. @ Mh, 3 O' Clock. Active
336.2MGOGrease Throughout The Reach (5%)

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-07-06T13:00:30-07:00
documentation
FRANKLIN, IGNACIO, BRAR
is_lateral_inspection
false