Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 5, 2017, 07:18 PM
  • A 0316_A 0315_752017_122232.mp4

Date
07/05/2017
W/O
0636060
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00325
PipeID
P08226
Time
12:18 PM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7453
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
20170705MI_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 0315
Downstream MH
A 0316
Dir. of Survey
Upstream
Length Surveyed
2.1 ft.
Total Length
2.1 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
4
O&M Quick
4200
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole A 0315 to A 0316
MH: A 0315MH: A 0316upstream0 ft. MGO - General Observation - MAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 45%0 ft. MGO - General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON2.1 ft. MWM - Water Mark, 50 %of cross sectional area2.1 ft. MWL - Water Level, 100 %of cross sectional area2.1 ft. MGO - General Observation - AIRLINE AT MH, 12 OCLOCK2.1 ft. AMH - Downstream Manhole, Survey Begins - 12:30 PM2.1 ft. LU - Alignment Up, 45 %

Observation photos (5)

  • General Observation - AIRLINE AT MH, 12 OCLOCK

    0 ft. - General Observation - AIRLINE AT MH, 12 OCLOCK

  • General Observation - MAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 45%

    2.1 ft. - General Observation - MAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 45%

  • General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

    2.1 ft. - General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

    2.1 ft. - Survey Abandoned - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

Observations (9)

DistanceCodeObservation
0MWM
2.1MGOMAGNESIUM HYDROXIDE COAT, FROM 8 TO 4 OCLOCK, 45%
2.1MGOVIEW OF THE UPLEG PIPE OF THE D/S SIPHON
0MWL
0MGOAIRLINE AT MH, 12 OCLOCK
0AMH12:30 PM
2.1SSS
0LU
2.1MSAVIEW OF THE UPLEG PIPE OF THE D/S SIPHON

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-07-05T12:18:20-07:00
documentation
IGNACIO, BRAR, SHADLER
is_lateral_inspection
false