Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 14, 2017, 03:57 PM
  • 29 0211_29 0206_8142017_090005.mp4

Date
08/14/2017
W/O
PENDING
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01026
PipeID
P24113
Time
8:57 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7490
Sewer Name
29 28TH STREET PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
20170814DF_28TH_ST_P_P_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0211
Downstream MH
29 0206
Dir. of Survey
Downstream
Length Surveyed
252.5 ft.
Total Length
252.5 ft.
Structural Index
4
Structural Quick
5121
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0211 to 29 0206
MH: 29 0211MH: 29 0206downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 8:58 AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.2 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"37.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"39.3 ft. MGO - General Observation - SPALLING65.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"88.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"115.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"138.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"152.3 ft. MGP - General Photograph - SPALLING165.5 ft. MGP - General Photograph - BROKEN PIPE165.5 ft. B - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES165.9 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"188.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"237.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"249.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish249.8 ft. MGO - General Observation - Grease Throughout The Reach (5%)252.5 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active252.5 ft. AMH - Downstream Manhole, Survey Ends - 9:25 AM252.5 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - SPALLING

    39.3 ft. - General Observation - SPALLING

  • General Photograph - SPALLING

    152.3 ft. - General Photograph - SPALLING

  • General Photograph - BROKEN PIPE

    165.5 ft. - General Photograph - BROKEN PIPE

  • Broken, from 05 to 07 o'clock, within 8 inches of joint: YES

    165.5 ft. - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
249.8SSS
0MWM
88.1TFC
165.5MGPBROKEN PIPE
188.8TFC
165.9TFC
249.8MGOGrease Throughout The Reach (5%)
252.5MGOConn. @ Mh, 3 O' Clock. Active
252.5AMH9:25 AM
0MWL
237.2TFC
65.2TFC
0AMH8:58 AM
2SSS
138.3TFA
152.3MGPSPALLING
252.5MGOROACHES @ MH
115.3TFC
37.7TFC
165.5B
39.3MGOSPALLING
15.2TFA

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-08-14T08:57:36-07:00
documentation
FRANKLIN, IGNACIO
is_lateral_inspection
false