Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2017, 08:14 AM
  • Section#3_F 0211_F 0210__8122017__G6799.mp4

Date
08/12/2017
W/O
0646419
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00048
PipeID
P10341
Time
1:14 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6799
Sewer Name
F JOINT OUTFALL F - UNIT 7F
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20170812MDM_JOINT_OUTFALL_F_UNIT_7F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
F 0211
Downstream MH
F 0210
Dir. of Survey
Downstream
Length Surveyed
594.9 ft.
Total Length
594.9 ft.
Structural Index
2
Structural Quick
2W00
Structural Rating
238
O&M Index
3
O&M Quick
3523
O&M Rating
21
Overall Index
2
Overall Quick
Overall Rating
259
Pipe schematic from manhole F 0211 to F 0210
MH: F 0211MH: F 0210downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:50AM2 ft. MGO - General Observation - MAG COAT 98% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE6.4 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES95.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB100.4 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start100.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 8" - ACTIVE103.2 ft. DAE - Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES110.1 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish214.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB275 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB332.3 ft. MGO - General Observation - MAG COATB 98%381.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB479.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB537.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start553.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish564.1 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES564.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB- POSSIBLE594.6 ft. MGO - General Observation - MAG COAT 98% FINISH594.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE594.9 ft. AMH - Downstream Manhole, Survey Ends - 6:20AM

Observation photos (9)

  • General Observation - MAG COAT 98% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    6.4 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    100.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    103.2 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Observation - MAG COATB 98%

    332.3 ft. - General Observation - MAG COATB 98%

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    537.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 02 to 05 o'clock,  , within 8 inches of joint: YES

    564.1 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB- POSSIBLE

    564.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB- POSSIBLE

Observations (23)

DistanceCodeObservation
0MWM
100.4DAGS
0MWL
275TFCSTUB
100.4TFACTIVE
594.6MGOMAG COAT 98% FINISH
103.2DAE
564.1DAE
553.5DAGS
332.3MGOMAG COATB 98%
479.1TFCSTUB
381.9TFCSTUB
2MGOMAG COAT 98% START 8:00 TO 4:00
2SSSBLISTERING PEELING CONCRETE
594.6SSSBLISTERING PEELING CONCRETE
95.5TFCSTUB
110.1DAGS
0AMH5:50AM
594.9AMH6:20AM
537.7DAGS
214.6TFCSTUB
564.1TFCSTUB- POSSIBLE
6.4DAE

Properties (6)

custom_field_three
98% OLD MAG COAT
custom_field_two
5
customer
LACSD
datetime
2017-08-12T01:14:38-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false