Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2017, 08:13 AM
  • Section#2_F 0211A_F 0211__8122017__G6799.mp4

Date
08/12/2017
W/O
0646419
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00048
PipeID
P10342
Time
1:13 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6799
Sewer Name
F JOINT OUTFALL F - UNIT 7F
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20170812MDM_JOINT_OUTFALL_F_UNIT_7F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
F 0211A
Downstream MH
F 0211
Dir. of Survey
Downstream
Length Surveyed
134.6 ft.
Total Length
134.6 ft.
Structural Index
2
Structural Quick
2D00
Structural Rating
52
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
52
Pipe schematic from manhole F 0211A to F 0211
MH: F 0211AMH: F 0211downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:20AM0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN ACTIVE 9:300 ft. MGO - General Observation - MAG COAT 98% 8:00 TO 4:00 START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLIOSTERING PEELING CONCRETE22.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB64.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE POSSIBLE MINERIAL DEPOSITS AROUND108.8 ft. MGP - General Photograph134.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE134.1 ft. MGO - General Observation - MAG COAT 98% FINISH134.6 ft. AMH - Downstream Manhole, Survey Ends - 5:35AM

Observation photos (4)

  • General Observation - MAG COAT 98% 8:00 TO 4:00 START

    0 ft. - General Observation - MAG COAT 98% 8:00 TO 4:00 START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLIOSTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLIOSTERING PEELING CONCRETE

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE POSSIBLE MINERIAL DEPOSITS AROUND

    64.5 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE POSSIBLE MINERIAL DEPOSITS AROUND

  • General Photograph

    108.8 ft. - General Photograph

Observations (13)

DistanceCodeObservation
0AMH5:20AM
64.5TFACTIVE POSSIBLE MINERIAL DEPOSITS AROUND
134.1SSSBLISTERING PEELING CONCRETE
0MGOMH CONN ACTIVE 9:00
2SSSBLIOSTERING PEELING CONCRETE
22.1TFCSTUB
0MWM
0MWL
0MGOMH CONN ACTIVE 9:30
134.1MGOMAG COAT 98% FINISH
0MGOMAG COAT 98% 8:00 TO 4:00 START
134.6AMH5:35AM
108.8MGP

Properties (6)

custom_field_three
98% OLD MAG COAT
custom_field_two
5
customer
LACSD
datetime
2017-08-12T01:13:17-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false