Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2016, 06:17 AM
  • 02 2108_02 1141_11032016_231745.mp4

Date
11/03/2016
W/O
602268
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00351
PipeID
P02925
Time
11:17 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3907
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Routine Assessment
Project
WO_602268_TV02061_NOV2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 2108
Downstream MH
02 1141
Dir. of Survey
Downstream
Length Surveyed
305.5 ft.
Total Length
305.5 ft.
Structural Index
3
Structural Quick
3J21
Structural Rating
161
O&M Index
2
O&M Quick
412K
O&M Rating
125
Overall Index
2
Overall Quick
Overall Rating
286
Pipe schematic from manhole 02 2108 to 02 1141
MH: 02 2108MH: 02 1141downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 02 21080 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 4 O'CLOCK0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start22.8 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES24.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"42.5 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES46 ft. RFJ - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR46 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start76.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"304 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish304 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304 ft. MGO - General Observation - COCKROACHES IN MANHOLE305.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1141

Observation photos (7)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

    22.8 ft. - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    42.5 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

    46 ft. - Roots Fine Joint, at 03 o'clock, within 8 inches of joint: YESR

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    46 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    304 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (20)

DistanceCodeObservation
226.8TFC
304DAGS
42.5CL
24.8TFC
277.9TFC
2DAGS
0MGOCOCKROACHES IN MANHOLE
304CM
22.8CM
46RFJ
124.7TFC
0AMH02 2108
46CM
179.6TFC
76.8TFC
0MWM
305.5AMH02 1141
0MGOACTIVE CONNECTION AT MH 4 O'CLOCK
304MGOCOCKROACHES IN MANHOLE
0MWL

Properties (6)

additional_info
SC306345
custom_field_two
3
customer
LACSD
datetime
2016-11-03T23:17:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false