Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 4, 2016, 09:27 AM
  • 02 1125_02 1124_11042016_023204.mp4

Date
11/04/2016
W/O
602268
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00351
PipeID
P02905
Time
2:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3907
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_602268_TV02061_NOV2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1125
Downstream MH
02 1124
Dir. of Survey
Downstream
Length Surveyed
270.5 ft.
Total Length
270.5 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
153
O&M Index
2
O&M Quick
412T
O&M Rating
216
Overall Index
2
Overall Quick
Overall Rating
369
Pipe schematic from manhole 02 1125 to 02 1124
MH: 02 1125MH: 02 1124downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 11250 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start13.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish268.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish268.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish270.5 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK270.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1124

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    13.3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
49.8TBA
2DAGS
30.9TFC
0AMH02 1125
270.5MGOCAPPED CONNECTION AT MH 9 O'CLOCK
268.7DAGS
85.8TFC
268.7CM
13.3CM
0MWL
2DAE
0MWM
270.5AMH02 1124
268.7DAE

Properties (6)

additional_info
SC306345
custom_field_two
3
customer
LACSD
datetime
2016-11-04T02:27:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false