01 0520A_01 0520_08112016_004635.mp4
2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.6 ft. - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES
5.6 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
50 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"
52.7 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
85.2 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"
89 ft. - Crack Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES
100 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"
114.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
145 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 3.6 | FM | — |
| 0 | MWM | — |
| 5.6 | TFC | — |
| 145 | DAGS | — |
| 2.2 | DAGS | — |
| 85.2 | TF | — |
| 100 | TFA | — |
| 148.4 | AMH | 01 0520 |
| 0 | MGO | ROACHES IN MH |
| 0 | MWL | — |
| 52.7 | TFC | — |
| 148.4 | MGO | ROACHES IN MH |
| 114.2 | TFC | — |
| 89 | CS | — |
| 0 | MGO | LATERAL AT MH 3 OCLOCK ACTIVE |
| 50 | TFA | — |
| 54.9 | VC | — |
| 0 | AMH | 01 0520A |