01 0529_01 0528_07112016_235634.mp4
2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
25.7 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
73.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"
100.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
121 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"
| Distance | Code | Observation |
|---|---|---|
| 131.2 | DAGS | — |
| 132.9 | AMH | 01 0529 |
| 0 | MGO | ROACHES IN MH |
| 121 | TFC | — |
| 25.7 | TFC | — |
| 73.7 | TFC | — |
| 2.3 | DAGS | — |
| 0 | MWL | — |
| 100.5 | TFC | — |
| 0 | MWM | — |
| 132.9 | MGO | ROACHES IN MH |
| 0 | AMH | 01 0528 |