Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2017, 06:03 PM
  • 29 0517_29 0516A_672017_112230.mp4

  • 29 0517_29 0516A_672017_112640.mp4

Date
06/07/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01106
PipeID
P24567
Time
11:03 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7429
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170606MI_19TH_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0517
Downstream MH
29 0516A
Dir. of Survey
Downstream
Length Surveyed
67.5 ft.
Total Length
67.5 ft.
Structural Index
3
Structural Quick
3825
Structural Rating
34
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
36
Pipe schematic from manhole 29 0517 to 29 0516A
MH: 29 0517MH: 29 0516Adownstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:20 AM8.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start26.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES27.1 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES28.5 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"31.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"32.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES35.5 ft. CM - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES38.7 ft. CL - Crack Longitudinal, at 07 o'clock, within 8 inches of joint: YES, Start38.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES42 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES42 ft. CL - Crack Longitudinal, at 07 o'clock, within 8 inches of joint: YES, Finish44.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES51.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES57.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES63.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES66.3 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES67.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish67.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish67.5 ft. AMH - Downstream Manhole, Survey Ends - LAMP HOLE AT MH 516A, BROKEN, END OF SET UP 11:45 AM

Observation photos (14)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    26.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    27.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    28.5 ft. - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"

    31.3 ft. - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    35.5 ft. - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 07 o'clock, within 8 inches of joint: YES, Start

    38.7 ft. - Crack Longitudinal, at 07 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    42 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    51.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    57.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    63.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    66.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    67.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (23)

DistanceCodeObservation
27.1CL
32.6CM
0MWM
0MWL
63.4CM
31.3TFA
35.5CM
66.3CL
28.5TFA
51.2CM
42CL
38.7CL
42CL
38.7CM
67.5AMHLAMP HOLE AT MH 516A, BROKEN, END OF SET UP 11:45 AM
44.8CM
8.1SSS
8.1DAGS
67.2DAGS
26.5CM
57.7CM
67.3SSS
0AMH11:20 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-06-07T11:03:46-07:00
documentation
IGNACIO, FRANKLIN, BRAR
is_lateral_inspection
false