Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2017, 05:48 PM
  • 29 0519A_29 0519_662017_105222.mp4

  • 29 0519A_29 0519_662017_112420.mp4

Date
06/06/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01106
PipeID
P24571
Time
10:48 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7427
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170606MI_19TH_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0519
Downstream MH
29 0519A
Dir. of Survey
Upstream
Length Surveyed
294.6 ft.
Total Length
294.6 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 29 0519 to 29 0519A
MH: 29 0519MH: 29 0519Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - CAPPED/BULK HEAD AT MH 519A, DEFECTIVE, BROKEN FROM 2 TO 4 OCLOCK0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN1.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES3.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"3.5 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES5.9 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"23.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"23.6 ft. MGO - General Observation - START OF NEW VIDEO CLIP, POWER WENT OUT ON CAMERA41.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"46.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.1 ft. MGO - General Observation - SURFACE SPALLING94.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES98.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"110.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"149.7 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"152.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"206.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"212.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"251 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"254 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"274.5 ft. TBD - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: NO, 6" - 75% DEBRIS INSIDE CONNECTION286.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start287.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"294.6 ft. MWM - Water Mark, 25 %of cross sectional area294.6 ft. MWL - Water Level, 5 %of cross sectional area294.6 ft. AMH - Downstream Manhole, Survey Begins - 10:51 AM

Observation photos (10)

  • Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"

    7 ft. - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Defective, at 10 o'clock, -,  , within 8 inches of joint: NO, 6" - 75% DEBRIS INSIDE CONNECTION

    20.1 ft. - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: NO, 6" - 75% DEBRIS INSIDE CONNECTION

  • Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    88.5 ft. - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    144.9 ft. - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    200.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - SURFACE SPALLING

    212.5 ft. - General Observation - SURFACE SPALLING

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    291.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    293.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Upstream Manhole, Survey Ends - CAPPED/BULK HEAD AT MH 519A, DEFECTIVE, BROKEN FROM 2 TO 4 OCLOCK

    294.6 ft. - Upstream Manhole, Survey Ends - CAPPED/BULK HEAD AT MH 519A, DEFECTIVE, BROKEN FROM 2 TO 4 OCLOCK

Observations (27)

DistanceCodeObservation
271TFC
88.5TFA
291.1TFA
0MWM
8SSS
294.6AMHCAPPED/BULK HEAD AT MH 519A, DEFECTIVE, BROKEN FROM 2 TO 4 OCLOCK
253TFA
200.4CM
82.3TFA
291.1CL
0MWL
0AMH10:51 AM
288.7TFA
184.3TFA
142.4TFA
144.9TFA
293.4CM
212.5MGOSURFACE SPALLING
294.6SSS
20.1TBD75% DEBRIS INSIDE CONNECTION
40.6TFA
7TFC
247.7TFC
271MGOSTART OF NEW VIDEO CLIP, POWER WENT OUT ON CAMERA
196TFC
43.6TFC
294.6TFOPEN

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2017-06-06T10:48:42-07:00
documentation
IGNACIO, FRANKLIN, BRAR
is_lateral_inspection
false