Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2017, 03:21 PM
  • 29 0529A_29 0529_652017_090542.mp4

Date
06/05/2017
W/O
0641042
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01106
PipeID
P24577
Time
8:21 AM
Certificate
415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7425
Sewer Name
29 19TH STREET SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20170605DF_19TH_ST_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0524
Downstream MH
29 0525
Dir. of Survey
Upstream
Length Surveyed
199.2 ft.
Total Length
199.2 ft.
Structural Index
3
Structural Quick
5241
Structural Rating
26
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole 29 0524 to 29 0525
MH: 29 0524MH: 29 0525upstream0 ft. AMH - Upstream Manhole, Survey Ends - 9:46 AM0.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.3 ft. TFB - Tap Factory Made Abandoned, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open4.2 ft. MGP - General Photograph - HOLE4.2 ft. H - Hole, from 09 to 11 o'clock, within 8 inches of joint: YES15.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open43.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: YES82.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open83 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING @ JOINT108.9 ft. MMC - Material Change, Vitrified clay pipe110.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open111.5 ft. MGP - General Photograph - CHIPPING @ JOINT 12 TO 12 O'CLOCK111.5 ft. MMC - Material Change, Concrete pipe (non-reinfored)113.7 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open149.4 ft. MGP - General Photograph - SPALLING150.4 ft. MMC - Material Change, Vitrified clay pipe158.2 ft. MMC - Material Change, Vitrified clay pipe160.6 ft. MMC - Material Change, Concrete pipe (non-reinfored)166.5 ft. CM - Crack Multiple, from 11 to 02 o'clock, within 8 inches of joint: YES181.5 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES183.8 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES187.3 ft. FM - Fracture Multiple, from 04 to 06 o'clock, within 8 inches of joint: YES187.3 ft. MGP - General Photograph - CHIPPING @ THE JOINT 4 TO 6 O'CLOCK190.1 ft. MMC - Material Change, Vitrified clay pipe191.2 ft. MGP - General Photograph - MATERIAL CHANGE197.2 ft. MMC - Material Change, Concrete pipe (non-reinfored)199.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start199.1 ft. MWM - Water Mark, 0 %of cross sectional area199.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start199.2 ft. MWL - Water Level, 0 %of cross sectional area199.2 ft. AMH - Downstream Manhole, Survey Begins - 8:25 AM

Observation photos (20)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    2 ft. - Material Change, Concrete pipe (non-reinfored)

  • General Photograph - MATERIAL CHANGE

    8 ft. - General Photograph - MATERIAL CHANGE

  • Material Change, Vitrified clay pipe

    9.1 ft. - Material Change, Vitrified clay pipe

  • Fracture Multiple, from 04 to 06 o'clock, within 8 inches of joint: YES

    11.9 ft. - Fracture Multiple, from 04 to 06 o'clock, within 8 inches of joint: YES

  • General Photograph - CHIPPING @ THE JOINT 4 TO 6 O'CLOCK

    11.9 ft. - General Photograph - CHIPPING @ THE JOINT 4 TO 6 O'CLOCK

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    15.4 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    17.7 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 02 o'clock, within 8 inches of joint: YES

    32.7 ft. - Crack Multiple, from 11 to 02 o'clock, within 8 inches of joint: YES

  • Material Change, Concrete pipe (non-reinfored)

    38.6 ft. - Material Change, Concrete pipe (non-reinfored)

  • Material Change, Vitrified clay pipe

    41 ft. - Material Change, Vitrified clay pipe

  • Material Change, Vitrified clay pipe

    48.8 ft. - Material Change, Vitrified clay pipe

  • General Photograph - SPALLING

    49.8 ft. - General Photograph - SPALLING

  • General Photograph - CHIPPING @ JOINT 12 TO 12 O'CLOCK

    87.7 ft. - General Photograph - CHIPPING @ JOINT 12 TO 12 O'CLOCK

  • Material Change, Concrete pipe (non-reinfored)

    87.7 ft. - Material Change, Concrete pipe (non-reinfored)

  • Material Change, Vitrified clay pipe

    90.3 ft. - Material Change, Vitrified clay pipe

  • Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING @ JOINT

    116.2 ft. - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - CHIPPING @ JOINT

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock,  , within 8 inches of joint: YES

    155.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: YES

  • General Photograph - HOLE

    195 ft. - General Photograph - HOLE

  • Hole, from 09 to 11 o'clock, within 8 inches of joint: YES

    195 ft. - Hole, from 09 to 11 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
38.6MMC
8MGPMATERIAL CHANGE
87.7MGPCHIPPING @ JOINT 12 TO 12 O'CLOCK
0.1CM
0.1MWM
198.8CM
116.2BCHIPPING @ JOINT
48.8MMC
198.8SSS
0MWL
41MMC
195.9TFBOpen
195MGPHOLE
155.4DAGS
195H
15.4CL
199.2AMH9:46 AM
87.7MMC
184.1TFOpen
49.8MGPSPALLING
11.9FM
17.7CL
0AMH8:25 AM
0.1SSS
85.5TFOpen
89TFOpen
9.1MMC
32.7CM
116.9TFOpen
2MMC
90.3MMC
11.9MGPCHIPPING @ THE JOINT 4 TO 6 O'CLOCK

Properties (6)

additional_info
ON SCREEN DISPLAY AND PROJECT BAR ARE WRONG. THIS IS MH 525 TO MH 524 U/S VIEW
custom_field_two
3
customer
LACSD
datetime
2017-06-05T08:21:28-07:00
documentation
FRANKLIN, IGNACIO, BRAR
is_lateral_inspection
false