Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 30, 2017, 05:19 PM
  • 21 0958_21 0957_3302017_105528.mp4

Date
03/30/2017
W/O
0618972
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00760
PipeID
P16053
Time
10:19 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7372
Sewer Name
21 CLAREMONT OUTFALL TRUNK
City
CLAREMONT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20170330DF_CLAREMONT_OUTFALL_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
21 0958
Downstream MH
21 0957
Dir. of Survey
Downstream
Length Surveyed
53.1 ft.
Total Length
53.1 ft.
Structural Index
4
Structural Quick
5121
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 21 0958 to 21 0957
MH: 21 0958MH: 21 0957downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:30 AM0.1 ft. MWM - Water Mark, 5 %of cross sectional area0.1 ft. MWL - Water Level, 0 %of cross sectional area2 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start48.5 ft. B - Broken, from 04 to 08 o'clock, within 8 inches of joint: YES49.3 ft. MGP - General Photograph - BROKEN53.1 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish53.1 ft. AMH - Downstream Manhole, Survey Ends - 11:03 AM

Observation photos (3)

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 04 to 08 o'clock, within 8 inches of joint: YES

    48.5 ft. - Broken, from 04 to 08 o'clock, within 8 inches of joint: YES

  • General Photograph - BROKEN

    49.3 ft. - General Photograph - BROKEN

Observations (8)

DistanceCodeObservation
0.1MWM
53.1SSS
48.5B
53.1AMH11:03 AM
49.3MGPBROKEN
2SSS
0AMH10:30 AM
0.1MWL

Properties (6)

custom_field_three
BROKEN PIPE
custom_field_two
1
customer
LACSD
datetime
2017-03-30T10:19:31-07:00
documentation
FRANKLIN, BRAR, SHADLER
is_lateral_inspection
false