Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 19, 2017, 06:31 AM
  • 18 1019_18 1018 _18042017_233215.mp4

Date
04/18/2017
W/O
630156
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00677
PipeID
P14873
Time
11:31 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4268
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 1
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_630156_TV18008_APR2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1019
Downstream MH
18 1018
Dir. of Survey
Downstream
Length Surveyed
220.2 ft.
Total Length
220.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 18 1019 to 18 1018
MH: 18 1019MH: 18 1018downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10190 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - LINER2.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAGNESIUM COATING START25.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"37.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"94.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"134.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"156.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"217.2 ft. MGO - General Observation - MAGNESIUM COATING END217.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish220.2 ft. AMH - Downstream Manhole, Survey Ends - 18 1018220.2 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK ACTIVE

Observation photos (1)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
220.2AMH18 1018
0MWM
0AMH18 1019
2.6DAGS
217.2MGOMAGNESIUM COATING END
0MWL
220.2MGOLATERAL AT MH 3 OCLOCK ACTIVE
134.6TFA
0MGOLINER
2.6MGOMAGNESIUM COATING START
37.4TFA
156.3TFA
25.4TFA
217.2DAGS
94.2TFA

Properties (8)

additional_info
SC306848
custom_field_two
4
customer
LACSD
datetime
2017-04-18T23:31:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP
year_laid
38344