Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2016, 08:25 AM
  • 01 0180_01 0179A_31082016_012521.mpg

Date
08/31/2016
W/O
585995
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00202
PipeID
P01220
Time
1:25 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3576
Sewer Name
01 COMPTON AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_585995_TV01012_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0180
Downstream MH
01 0179A
Dir. of Survey
Downstream
Length Surveyed
159.6 ft.
Total Length
159.6 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 01 0180 to 01 0179A
MH: 01 0180MH: 01 0179Adownstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK CAPPED0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK CAPPED0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 01803.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES25.2 ft. CM - Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES29 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start45.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"47.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"74.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"101 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"159.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish159.6 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK159.6 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK159.6 ft. AMH - Downstream Manhole, Survey Ends - 01 0179A

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    3.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

    25.2 ft. - Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    29 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
45.5TF
74.3TF
0MWL
159.6CM
106.7TFC
0MGOLATERAL AT MH 9 OCLOCK CAPPED
29CM
159.6MGOLATERAL AT MH 9 OCLOCK
150.4TFC
159.6MGOLATERAL AT MH 3 OCLOCK
47.9TFC
68.9TF
25.2CM
101TFC
0MGOLATERAL AT MH 3 OCLOCK CAPPED
159.6AMH01 0179A
0MWM
112.3TFC
0AMH01 0180
127.2TFC
3.4CM

Properties (6)

additional_info
SC306166
custom_field_two
3
customer
LACSD
datetime
2016-08-31T01:25:00-07:00
documentation
PROPIPE
is_lateral_inspection
false