Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2016, 08:48 AM
  • B 1062_B 1061 _08162016_020210.mp4

Date
08/16/2016
W/O
585984
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00923
PipeID
P22906
Time
1:48 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3683
Sewer Name
B JOINT OUTFALL B - UNIT 1C REPLACEMENT
City
MONTEBELLO, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
21
Purpose
Routine Assessment
Project
WO_585984_TV02129_AUG2016
Sewer Type
Gravity
Material
RGRCP-PTL
Shape
Circular
Height
78 in.
Width
78 in.
Upstream MH
B 1062
Downstream MH
B 1061
Dir. of Survey
Downstream
Length Surveyed
794.3 ft.
Total Length
794.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole B 1062 to B 1061
MH: B 1062MH: B 1061downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Downstream Manhole, Survey Begins - B 10270 ft. AMH - Upstream Manhole, Survey Begins - B 106210.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start787.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish794.3 ft. AMH - Downstream Manhole, Survey Ends - B 1061

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    10.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
10.2DAGS
0MWL
794.3AMHB 1061
787.5DAGS
0MWM
0AMHB 1027
0AMHB 1062

Properties (6)

additional_info
SC306013
custom_field_two
4
customer
LACSD
datetime
2016-08-16T01:48:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false