29 0584_29 0583_5312017_103905.mp4
0 ft. - Upstream Manhole, Survey Begins - 10:03 AM
2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
14.8 ft. - General Observation - SPALLING
21.1 ft. - General Photograph
28 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
38.4 ft. - General Photograph - SPALLING
52.4 ft. - General Photograph - SPALLING
74.5 ft. - General Photograph
74.5 ft. - General Photograph
74.5 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 14.8 | MGO | SPALLING |
| 0 | AMH | 10:03 AM |
| 38.4 | MGP | SPALLING |
| 21.1 | MGP | — |
| 74.5 | MGP | — |
| 74.5 | MGP | — |
| 74.5 | SSS | — |
| 74.5 | MGP | — |
| 28 | DAGS | — |
| 74.6 | AMH | 10:56 AM |
| 0 | MWM | — |
| 2 | SSS | — |
| 0 | MWL | — |
| 52.4 | MGP | SPALLING |