05 1114_05 1113_552017_110408.mp4
5.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
7.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES
19.5 ft. - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"
200.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
213.7 ft. - General Observation - SAG IN THE LINE
367.6 ft. - Downstream Manhole, Survey Ends - 11:26 AM
| Distance | Code | Observation |
|---|---|---|
| 19.5 | TFA | — |
| 0 | MWL | — |
| 200.1 | CM | — |
| 367.6 | MGO | WATER LEVEL SLIGHTLY HIGHER AT SAG, APPROX. 45% |
| 7.3 | DAGS | — |
| 0 | MWM | — |
| 213.7 | MGO | SAG IN THE LINE |
| 0 | AMH | 11:05 AM |
| 225.5 | CM | — |
| 366.1 | SSS | — |
| 48.5 | CC | — |
| 140.5 | TFA | — |
| 367.6 | AMH | 11:26 AM |
| 13.6 | CM | — |
| 5.5 | SSS | — |