05 1480_05 1479_472018_070811.mp4
2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED
8 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED
55.1 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING CONCRETE
78.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - METAL SEWER SNAKE
92.7 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish - METAL SEWER SNAKE
265 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - DEEP CORRISON
266.4 ft. - General Observation - VERY LITTLE AGG IN PIPE CONCRETE START
| Distance | Code | Observation |
|---|---|---|
| 8 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 55.1 | SSS | MULTILAYER PEELING CONCRETE |
| 219.1 | TF | Active |
| 0 | AMH | 7:05AM |
| 0 | MWM | — |
| 321.1 | SSS | MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 0 | MWL | — |
| 321.1 | MGO | VERY LITTLE AGG IN PIPE CONCRETE FINISH |
| 321.6 | AMH | 7:35AM |
| 265 | SSS | DEEP CORRISON |
| 165.6 | TFC | Capped |
| 266.4 | MGO | VERY LITTLE AGG IN PIPE CONCRETE START |
| 2 | SSS | MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 92.7 | DSZ | METAL SEWER SNAKE |
| 78.5 | DSZ | METAL SEWER SNAKE |
| 240.1 | TF | Active |
| 321.1 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 88.2 | TF | Active |