05 1483_05 1482_472018_042428.mp4
2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED
44.6 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - PEELNG CONCRETE
45.8 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - SINGLE LAYER PEELING
59.5 ft. - Surface Spalling, from 07 to 10 o'clock, within 8 inches of joint: YES - DEEP PEELING
63.2 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING
173.1 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING CONCRETE
180.5 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - PEELED CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 230.7 | TF | Open |
| 180.5 | DSZ | PEELED CONCRETE |
| 285.4 | AMH | 4:45AM |
| 0 | AMH | 4:20AM |
| 0 | MWM | — |
| 148.5 | TFC | Capped |
| 44.6 | SSS | PEELNG CONCRETE |
| 59.5 | SSS | DEEP PEELING |
| 285.1 | SSS | MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 2 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 63.2 | TFC | Capped |
| 173.1 | SSS | MULTILAYER PEELING CONCRETE |
| 285.1 | MGO | Conn. @ Mh, 3 O' Clock. STUB |
| 45.8 | SSS | SINGLE LAYER PEELING |
| 0 | MWL | DRY LINE |
| 63.2 | SSS | MULTILAYER PEELING |