Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 7, 2018, 07:39 AM
  • 05 1486_05 1485_472018_013905.mp4

Date
04/07/2018
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00438
PipeID
P06712
Time
12:39 AM
Certificate
U-1014-0602253
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H0808
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Maintenance Related
Project
20180407MDM_EL_NIDO_TRUNK
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
05 1486
Downstream MH
05 1485
Dir. of Survey
Downstream
Length Surveyed
231.4 ft.
Total Length
231.4 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 05 1486 to 05 1485
MH: 05 1486MH: 05 1485downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTCHED61.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped65.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open71.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open79.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED118.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE126.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open178.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped190.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open190.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active231 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED231.4 ft. AMH - Downstream Manhole, Survey Ends - 1:45AM

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start -  PEELING CONCRETE SEVERE AGG ATTCHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTCHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    79.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    118.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (16)

DistanceCodeObservation
61.9TFCCapped
190.2TFOpen
0MWM
2SSSPEELING CONCRETE SEVERE AGG ATTCHED
0AMH1:25AM
65.5TFOpen
71.4TFOpen
0MGOConn. @ Mh, 3 O' Clock. Active
79.9SSSPEELING CONCRETE SEVERE AGG ATTACHED
118.4SSSPEELING CONCRETE
190.2TFActive
231.4AMH1:45AM
231SSSPEELING CONCRETE SEVERE AGG ATTACHED
178.3TFCCapped
0MWL
126.1TFOpen

Properties (7)

additional_info
CHECK FOR ABNORMALITES
custom_field_three
PEELING CONCRETE SEVERE AGG ATTCHED
custom_field_two
2
customer
LACSD
datetime
2018-04-07T00:39:39-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false