Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 29, 2018, 01:05 PM
  • 18 1111_18 0754_10292018_100109.mp4

Date
10/29/2018
W/O
0721532
Weather
Damp
Operator/Surveyor
FRANKLIN
Sewer ID
Z00706
PipeID
P14611
Time
6:05 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7840
Sewer Name
18 SO WHITTIER OUTFALL TR, SECTS 1,2,3,&4
City
SO WHITTIER
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
26
Purpose
Routine Assessment
Project
20181029DF_SO_WHITTIER_OUTFALL_TR_SECTS_1_2_3_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 1111
Downstream MH
18 0754
Dir. of Survey
Downstream
Length Surveyed
7.8 ft.
Total Length
7.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 18 1111 to 18 0754
MH: 18 1111MH: 18 0754downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:59 AM0.1 ft. MWM - Water Mark, 30 %of cross sectional area0.1 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.3 ft. MGP - General Photograph7.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish7.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish7.8 ft. AMH - Downstream Manhole, Survey Ends - 10:06 AM7.8 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)7.8 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach

Observation photos (4)

  • Water Mark, 30 %of cross sectional area

    0.1 ft. - Water Mark, 30 %of cross sectional area

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    6.3 ft. - General Photograph

Observations (11)

DistanceCodeObservation
7.1SAP
2SAV
7.8AMH10:06 AM
7.1SAV
7.8MGOGREASE THROUGHOUT THE REACH (5%)
6.3MGP
0.1MWM
2SAP
7.8MGOPeeling & Flaking Throughout The Reach
0.1MWL
0AMH9:59 AM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-10-29T06:05:42-07:00
documentation
FRANKLIN, CASTILLO, SHADLER, YOUNG
is_lateral_inspection
false