Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 28, 2018, 03:45 PM
  • 08 0565_08 0647_3282018_090952.mp4

Date
03/28/2018
W/O
0697912
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00558
PipeID
P21472
Time
8:45 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7670
Sewer Name
08 DAVIDSON CITY P.P. INFLUENT SEWER
City
CARSON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
20180328SHO_DAVIDSON_CITY_PP_INFLUENT_SEWER
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
08 0565
Downstream MH
08 0647
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 08 0565 to 08 0647
MH: 08 0565MH: 08 0647downstream0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 09102 ft. AMH - Downstream Manhole, Survey Ends - ZOOMED TO MH 6472 ft. SAP - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES

Observation photos (1)

  • Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (5)

DistanceCodeObservation
0MWL
0MWM
2AMHZOOMED TO MH 647
0AMH0910
2SAP

Properties (7)

additional_info
HANGING THE CAMERA AND ZOOMING
custom_field_three
PROJECTING AGG.
custom_field_two
3
customer
LACSD
datetime
2018-03-28T08:45:00-07:00
documentation
OBREGON, BRAR, VENDRYES
is_lateral_inspection
false