Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2018, 07:09 PM
  • 18 1118A_18 1118_232018_111229.mp4

  • 18 1118A_18 1118_232018_111943.mp4

  • 18 1118A_18 1118_232018_112111.mp4

Date
02/03/2018
W/O
0688138
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00711
PipeID
P14971
Time
11:09 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7621
Sewer Name
18 STAGE ROAD JUNCTION TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
20180203DF_STAGE_ROAD_JUNCTION_TR
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
18 1118A
Downstream MH
18 1118
Dir. of Survey
Downstream
Length Surveyed
253.8 ft.
Total Length
253.8 ft.
Structural Index
3
Structural Quick
5141
Structural Rating
16
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 18 1118A to 18 1118
MH: 18 1118AMH: 18 1118downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:11 AM2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start15.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES15.5 ft. BVV - Broken Void Visible, from 08 to 10 o'clock, within 8 inches of joint: YES19.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"31.9 ft. MGP - General Photograph56.2 ft. MGP - General Photograph71.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"119.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"168.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"219.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"251.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish251.3 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish253.8 ft. AMH - Downstream Manhole, Survey Ends - 11:45 AM

Observation photos (7)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    15.5 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Broken Void Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

    15.5 ft. - Broken Void Visible, from 08 to 10 o'clock, within 8 inches of joint: YES

  • General Photograph

    31.9 ft. - General Photograph

  • General Photograph

    56.2 ft. - General Photograph

Observations (21)

DistanceCodeObservation
251.3FM
251.3SSS
71.2TFC
31.9MGP
2FM
219.6TFC
253.8AMH11:45 AM
168.4TFC
5MWLS
2CM
2SSS
15.5DAGS
19.2TFC
0MWL
15.5BVV
251.2CM
56.2MGP
0MWM
251.3MWLS
0AMH11:11 AM
119.2TFC

Properties (5)

custom_field_two
1
customer
LACSD
datetime
2018-02-03T11:09:07-08:00
documentation
FRANKLIN, VENDRYES
is_lateral_inspection