Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2018, 06:41 PM
  • 18 1120_18 1119_232018_104256.mp4

Date
02/03/2018
W/O
0688138
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00711
PipeID
P14973
Time
10:41 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7621
Sewer Name
18 STAGE ROAD JUNCTION TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
20180203DF_STAGE_ROAD_JUNCTION_TR
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
18 1120
Downstream MH
18 1119
Dir. of Survey
Downstream
Length Surveyed
56 ft.
Total Length
56 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
16
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 18 1120 to 18 1119
MH: 18 1120MH: 18 1119downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:41 AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.3 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start24 ft. CL - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES31.2 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area, Start36.2 ft. MGP - General Photograph41.9 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area, Finish49.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"53.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53.7 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish53.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish56 ft. AMH - Downstream Manhole, Survey Ends - 10:52 AM56 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    24 ft. - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    36.2 ft. - General Photograph

Observations (18)

DistanceCodeObservation
2SSS
56AMH10:52 AM
31.2MWLS
53.7CM
53.7FM
36.2MGP
0MWM
2CM
53.7MWLS
2FM
53.7SSS
0MWL
41.9MWLS
24CL
49.2TFC
56MGOGrease Throughout The Reach (5%)
13.3MWLS
0AMH10:41 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-02-03T10:41:01-08:00
documentation
FRANKLIN, VENDRYES
is_lateral_inspection
false