Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 1, 2018, 09:04 PM
  • 19 0178_19 0177_212018_131446.mp4

Date
02/01/2018
W/O
PENDING
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00720
PipeID
P15146
Time
1:04 PM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7618
Sewer Name
19 DAIRY VALLEY TRUNK
City
CERRITOS
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20180201SHO_DAIRY_VALLEY_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
19 0178
Downstream MH
19 0177
Dir. of Survey
Downstream
Length Surveyed
329 ft.
Total Length
329 ft.
Structural Index
2
Structural Quick
5241
Structural Rating
26
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
26
Pipe schematic from manhole 19 0178 to 19 0177
MH: 19 0178MH: 19 0177downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01150 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area3 ft. CC - Crack Circumferential, from 12 to 12 o'clock, within 8 inches of joint: YES60 ft. SSS - Surface Spalling, at 12 o'clock, within 8 inches of joint: YES102.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES103.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"105.1 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES115.8 ft. CC - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES217.8 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES218.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN220.2 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES272.2 ft. CC - Crack Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES284.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN287.8 ft. CC - Crack Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES307.7 ft. CC - Crack Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES312.5 ft. SSS - Surface Spalling, at 03 o'clock, within 8 inches of joint: YES327.1 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)329 ft. AMH - Downstream Manhole, Survey Ends - 0140

Observation photos (2)

  • Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

    105.1 ft. - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    220.2 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
60SSS
272.2CC
327.1MGOGREASE THROUGHOUT THE REACH (5%)
312.5SSS
0AMH0115
220.2B
103.1TFC
0MWL
105.1B
3CC
102.5CM
217.8FM
329AMH0140
284.1TFOPEN
0MWM
115.8CC
287.8CC
218.7TFOPEN
307.7CC

Properties (7)

additional_info
RFIR
custom_field_three
BROKEN PIPE
custom_field_two
2
customer
LACSD
datetime
2018-02-01T13:04:20-08:00
documentation
OBREGON, VENDRYES, BRAR
is_lateral_inspection
false