Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2018, 08:38 AM
  • 20 0126_20 0125 _26012018_004642.mp4

Date
01/26/2018
W/O
684819
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19049
Time
12:38 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5387
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_684819_TV20027_FEB2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0125
Downstream MH
20 0126
Dir. of Survey
Upstream
Length Surveyed
130.3 ft.
Total Length
130.3 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
125
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
175
Pipe schematic from manhole 20 0125 to 20 0126
MH: 20 0125MH: 20 0126upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01260 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK1.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish46.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start128.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start128.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start130.3 ft. MWL - Water Level, 10 %of cross sectional area130.3 ft. AMH - Downstream Manhole, Survey Begins - 20 0125

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
129SAP
130.3AMH20 0126
0MWL
2SSS
83.9TFC
129SSS
2SAP
80.1TFC
0AMH20 0125
2DAGS
129DAGS
130.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK