Wastewater/Activity/PacpInspection/1.0Jan 26, 2018, 05:29 AM
  • 20 0129A_20 0129 _25012018_213559.mp4

Date
01/25/2018
W/O
684819
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19053
Time
9:29 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5387
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
WO_684819_TV20027_FEB2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0129A
Downstream MH
20 0129
Dir. of Survey
Downstream
Length Surveyed
117.6 ft.
Total Length
117.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
115
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
2
Overall Quick
Overall Rating
161
Pipe schematic from manhole 20 0129A to 20 0129
MH: 20 0129AMH: 20 0129downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - 20 0129A2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start84.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"88.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish116.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish117.6 ft. AMH - Downstream Manhole, Survey Ends - 20 0129

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
88.7TFC
116.1SSS
117.6AMH20 0129
84.4TFC
0MWL
116.1DAGS
2SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0DAGS
2SSS
0AMH20 0129A
116.1SAP

Properties (6)

additional_info
SC346966
custom_field_two
2
customer
LACSD
datetime
2018-01-25T21:29:12-08:00
documentation
PRO PIPE
is_lateral_inspection
false