Wastewater/Activity/PacpInspection/1.0Sep 20, 2018, 11:09 AM
  • Section#8_B 0192_B 0191__9202018__I0074.mp4

Date
09/20/2018
W/O
0730226
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00075
PipeID
P08678
Time
4:09 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0074
Sewer Name
B JOINT OUTFALL B - UNIT 1D
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
20180919_JOINT_OUTFALL_B_UNIT_1D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
B 0192
Downstream MH
B 0191
Dir. of Survey
Downstream
Length Surveyed
675.8 ft.
Total Length
675.8 ft.
Structural Index
3
Structural Quick
513[
Structural Rating
692
O&M Index
2
O&M Quick
512Z
O&M Rating
275
Overall Index
2
Overall Quick
Overall Rating
967
Pipe schematic from manhole B 0192 to B 0191
MH: B 0192MH: B 0191downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:35AM0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 85% START 10:00 TO 2:02 ft. DAGS - Deposits Attached Grease, 1`0 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start14.8 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG25.7 ft. SAP - Surface Aggregate Projecting, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG146.2 ft. SRV - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE CIRCUM REBAR167.4 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG220.3 ft. MGO - General Observation - 90% MAG COAT START450.5 ft. SAP - Surface Aggregate Projecting, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG675.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish675.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE675.2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG675.2 ft. MGO - General Observation - MAG COAT 90% FINISH675.8 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (10)

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 85% START 10:00 TO 2:0

    2 ft. - General Observation - MAG COAT 85% START 10:00 TO 2:0

  • Deposits Attached Grease, 1`0 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 1`0 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    14.8 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG

    25.7 ft. - Surface Aggregate Projecting, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE CIRCUM REBAR

    146.2 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE CIRCUM REBAR

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    167.4 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - 90% MAG COAT START

    220.3 ft. - General Observation - 90% MAG COAT START

  • Surface Aggregate Projecting, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    450.5 ft. - Surface Aggregate Projecting, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (18)

DistanceCodeObservation
675.2DAGS
146.2SRVPOSSIBLE CIRCUM REBAR
675.2SSSBLISTERING PEELING CONCRETE
2SAPSEVERE AGG UNDER MAG COAT
0MWL
450.5SAPSEVERE AGG
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
2MGOMAG COAT 85% START 10:00 TO 2:0
675.2SAPSEVERE AGG
675.8AMH5:20AM
0AMH4:35AM
220.3MGO90% MAG COAT START
14.8SAPSEVERE AGG
167.4SAPSEVERE AGG
25.7SAPSEVERE AGG
0MWM
2DAGS
675.2MGOMAG COAT 90% FINISH

Properties (6)

custom_field_three
CIRCUM REBAR POSSIBLE-SEVERE AGG PROJECTING-90% MA
custom_field_two
2
customer
LACSD
datetime
2018-09-20T04:09:19-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false