Section#5_B 0188_B 0186__9202018__I0073.mp4
2 ft. - General Observation - MAG COAT 98% START 10:00 TO 2:00
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
8 ft. - General Observation - 54"RCP
57 ft. - Surface Aggregate Projecting, from 10 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
219.8 ft. - General Observation - 100% MAG COAT START
400.4 ft. - General Observation - MAG COAT 100% START 9:00 TO 3:00
400.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
400.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 1:35AM |
| 0 | MWM | — |
| 400.4 | MGO | MAG COAT 100% START 9:00 TO 3:00 |
| 2 | MGO | MAG COAT 98% START 10:00 TO 2:00 |
| 400.4 | SAP | SEVERE AGG |
| 57 | SAP | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 632.6 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 400.4 | SAP | SEVERE AGG |
| 8 | MGO | 54"RCP |
| 219.8 | MGO | 100% MAG COAT START |
| 400.4 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 632.5 | SAP | SEVERE AGG UNDER MAG COAT |
| 2 | SAP | SEVERE AGG |
| 400.4 | MWM | — |
| 0 | MWL | — |
| 400.4 | MWL | — |
| 632.5 | MGO | MAG COAT 100% FINISH |
| 400.4 | SSS | — |
| 632.8 | AMH | 2:20AM |