Section#4_B 0193_B 0192__9192018__I0073.mp4
2 ft. - General Observation - MAG COAT100% START 10:00 TO 2:00
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
10.9 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
18.2 ft. - Surface Aggregate Projecting, from 12 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
73.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
169 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
212.6 ft. - General Observation - MAG COAT 95% START
419.5 ft. - Surface Aggregate Projecting, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
551.9 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
762.8 ft. - General Photograph - 100% MAG COAT
851.1 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 890.4 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT100% START 10:00 TO 2:00 |
| 419.5 | SAP | SEVERE AGG |
| 851.1 | SAP | SEVERE AGG |
| 0 | AMH | 4:50AM |
| 169 | MGO | 80% MAG COAT |
| 890.4 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 551.9 | SAP | SEVERE AGG |
| 762.8 | MGP | 100% MAG COAT |
| 890.4 | DAGS | — |
| 73.9 | DAGS | — |
| 18.2 | SAP | SEVERE AGG |
| 212.6 | MGO | MAG COAT 95% START |
| 890.9 | AMH | 5:50AM |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | MWM | — |
| 169 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 890.4 | MGO | MAG COAT 95% FINISH |
| 10.9 | SAP | SEVERE AGG UNDER MAG COAT |