Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2018, 06:06 AM
  • 01 1185_01 1184_02052018_232122.mp4

Date
05/02/2018
W/O
695981
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00225
PipeID
P02039
Time
11:06 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5553
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
05
Purpose
Routine Assessment
Project
WO_695981_TV01257_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1185
Downstream MH
01 1184
Dir. of Survey
Downstream
Length Surveyed
394.5 ft.
Total Length
394.5 ft.
Structural Index
3
Structural Quick
3^00
Structural Rating
468
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
468
Pipe schematic from manhole 01 1185 to 01 1184
MH: 01 1185MH: 01 1184downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 11850 ft. MWL - Water Level, 20 %of cross sectional area2.3 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start3.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"10.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"50.6 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES50.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish94.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start94.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"130.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"201 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"214 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"255 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"279.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"292.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"333.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"335.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"391.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK394.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK394.5 ft. AMH - Downstream Manhole, Survey Ends - 01 1184394.5 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES

    50.6 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    94.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (31)

DistanceCodeObservation
323.8TF
394.5MGOCONNECTION AT MH 3 O'CLOCK
2.3CM
394.5MGOCONNECTION AT MH 9 O'CLOCK
0MWM
214TF
279.9TF
391.9SAP
94.6SAV
50.6SAP
50.6TF
94.6SAP
10.2TF
255TF
333.2TF
211.4TF
0AMH01 1185
94.6TF
394.5AMH01 1184
128.4TF
91.5TF
6.8TF
201TF
171.9TF
394.5CM
3.1SAV
130.9TF
53.4TF
335.3TF
0MWL
292.5TF

Properties (6)

additional_info
SC359308
custom_field_two
3
customer
LACSD
datetime
2018-05-02T23:06:07-07:00
documentation
PROPIPE
is_lateral_inspection
false