Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2018, 09:14 AM
  • 01 0086_01 0085_03052018_022950.mp4

Date
05/03/2018
W/O
695951
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00209
PipeID
P00755
Time
2:14 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5554
Sewer Name
01 HOOPER AVENUE-COMPTON CREEK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Routine Assessment
Project
WO_695951_TV01254_APR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0086
Downstream MH
01 0085
Dir. of Survey
Downstream
Length Surveyed
351.5 ft.
Total Length
351.5 ft.
Structural Index
3
Structural Quick
4C3I
Structural Rating
236
O&M Index
3
O&M Quick
3D21
O&M Rating
74
Overall Index
3
Overall Quick
Overall Rating
310
Pipe schematic from manhole 01 0086 to 01 0085
MH: 01 0086MH: 01 0085downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 00860 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish42.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start65.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"65.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish65.4 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start121.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish143.1 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish158.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start172.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"197.3 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Start210.8 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start215.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"218 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"222.5 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Finish232.9 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish246.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"275.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"297.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"346.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK351.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0085351.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (7)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    22.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    42.4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    65.4 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    158.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 50 %of cross sectional area, Start

    197.3 ft. - Water Level, Sag in pipe, 50 %of cross sectional area, Start

  • Deposits Settled Other,  20 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO, Start

    210.8 ft. - Deposits Settled Other, 20 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start

Observations (32)

DistanceCodeObservation
346.1CM
121.2TF
324.4TBA
65.4FM
0MWL
215.4TFC
143.1DSZ
222.5TFC
246.1TFC
143.1FM
297.6TFC
218TBC
172.7TF
65.3TFC
275.4TFC
351.5MGOCONNECTION AT MH 3 O'CLOCK
65.3CM
210.8DSZ
232.9DSZ
158.2CM
22.6CM
351.5AMH01 0085
2.1FM
351.5MGOCONNECTION AT MH 9 O'CLOCK
0AMH01 0086
0MGOCONNECTION AT MH 3 O'CLOCK
222.5MWLS
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
22.6FM
197.3MWLS
42.4DSZ

Properties (6)

additional_info
SC359309
custom_field_two
2
customer
LACSD
datetime
2018-05-03T02:14:37-07:00
documentation
PROPIPE
is_lateral_inspection
false