Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2018, 12:44 PM
  • 05 2663_05 1916 _29012018_045515.mp4

Date
01/29/2018
W/O
684698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00501
PipeID
P07144
Time
4:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5388
Sewer Name
05 PALOS VERDES NORTH SLOPE TRUNK, SECT 1
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
35
Purpose
Routine Assessment
Project
WO_684698_TV05088_FEB2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1916
Downstream MH
05 2663
Dir. of Survey
Upstream
Length Surveyed
375.1 ft.
Total Length
375.1 ft.
Structural Index
3
Structural Quick
413N
Structural Rating
226
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
226
Pipe schematic from manhole 05 1916 to 05 2663
MH: 05 1916MH: 05 2663upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 26631.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish120.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES373.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start375.1 ft. MWL - Water Level, 5 %of cross sectional area375.1 ft. AMH - Downstream Manhole, Survey Begins - 05 1916

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    254.9 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (6)

DistanceCodeObservation
373.3SAP
254.9FM
0MWL
375.1AMH05 2663
2SAP
0AMH05 1916

Properties (6)

additional_info
SC346967
custom_field_two
2
customer
LACSD
datetime
2018-01-29T04:44:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false