Wastewater/Activity/PacpInspection/1.0Feb 9, 2018, 04:53 PM
  • 05 0022_05 0021_292018_101358.mp4

Date
02/09/2018
W/O
0674047
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00431
PipeID
P05307
Time
8:53 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7627
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
TORRANCE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
27
Purpose
Capital Improvement Program Assesment
Project
20180209SHO_DISTRICT_5_MAIN_TRUNK
Material
RCP-CTL
Shape
Circular
Height
48 in.
Upstream MH
05 0022
Downstream MH
05 0021
Dir. of Survey
Downstream
Length Surveyed
526.7 ft.
Total Length
526.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 05 0022 to 05 0021
MH: 05 0022MH: 05 0021downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10150 ft. MWM - Water Mark, 40 %of cross sectional area9 ft. MGO - General Observation - 95% MAG COAT INTACT91.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"325.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 8"422.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 8"526.7 ft. AMH - Downstream Manhole, Survey Ends - 1055

Observations (8)

DistanceCodeObservation
0MWL
9MGO95% MAG COAT INTACT
0AMH1015
325.8TFA
91.1TFA
422.7TFA
526.7AMH1055
0MWM

Properties (7)

additional_info
RFIR
custom_field_three
95% MAG COAT, NO MISSING TILES
custom_field_two
4
customer
LACSD
datetime
2018-02-09T08:53:08-08:00
documentation
OBREGON, BRAR, VENDRYES, PARAISO
is_lateral_inspection
false