29 0096_29 0095_752018_124128.mp4
9.5 ft. - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"
11.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
21.9 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES
35.1 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
35.1 ft. - Broken, from 07 to 10 o'clock, within 8 inches of joint: YES
38.4 ft. - Joint Offset Medium
38.4 ft. - Broken Soil Visible, from 03 to 06 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 38.4 | JOM | — |
| 9.5 | TFA | — |
| 33.7 | TFA | — |
| 21.9 | DSGV | — |
| 35.1 | CL | — |
| 38.4 | BSV | — |
| 0 | AMH | 12:39pm |
| 38.6 | DAGS | — |
| 0 | MGO | ROACHES > 50 AT THE MH |
| 35.1 | CL | — |
| 11.5 | DAGS | — |
| 0 | MWM | — |
| 35.1 | B | — |
| 38.6 | MSA | DUE TO OFFSET JOINTS IN THE PIPE |