Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 3, 2018, 06:02 PM
  • S_StartNode_29 0120_732018_111730.mp4

Date
07/03/2018
W/O
0711161
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00273
PipeID
P23911
Time
11:02 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7750
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
20180629DF_33RD_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0120
Dir. of Survey
Upstream
Length Surveyed
238 ft.
Total Length
238 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 29 0120 to unknown
MH: 29 0120MH: upstream0 ft. AMH - Upstream Manhole, Survey Ends - 11:38 AM1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"5.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open29.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"44 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4" - Open53.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"56.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"104.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open107.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open109.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open154.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open182.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open206 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"209 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"236 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start238 ft. MWL - Water Level, 5 %of cross sectional area238 ft. MWM - Water Mark, 10 %of cross sectional area238 ft. MGO - General Observation - ROACHES @ MH238 ft. AMH - Downstream Manhole, Survey Begins - 11:05 AM

Observation photos (1)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
184.4TFC
208.4TFA
29TFC
128.3TFOpen
235.1TFC
238AMH11:38 AM
0MWL
194TBOpen
133.3TFOpen
83.2TFOpen
0MWM
181.8TFC
2SSS
32TFC
55.7TBOpen
0MGOROACHES @ MH
0AMH11:05 AM
237SSS
232.3TFOpen
130.8TFOpen

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-07-03T11:02:53-07:00
documentation
FRANKLIN, PARAISO, AHUMADA
is_lateral_inspection
false