Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 19, 2018, 10:39 AM
  • B 0464_B 0463A _19062018_034529.mp4

Date
06/19/2018
W/O
706863
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00094
PipeID
P22204
Time
3:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5735
Sewer Name
B JOINT OUTFALL B - UNIT 5D
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_706863_TV16037_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0463A
Downstream MH
B 0464
Dir. of Survey
Upstream
Length Surveyed
138.5 ft.
Total Length
138.5 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
81
O&M Index
2
O&M Quick
2D00
O&M Rating
54
Overall Index
3
Overall Quick
Overall Rating
135
Pipe schematic from manhole B 0463A to B 0464
MH: B 0463AMH: B 0464upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 04641.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish136.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start136.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start138.5 ft. AMH - Downstream Manhole, Survey Begins - B 0463A138.5 ft. MWL - Water Level, 15 %of cross sectional area138.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK138.5 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0AMHB 0463A
2DAGS
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
138.5AMHB 0464
0MWM
136.7SAP
2SAP
136.7DAGS

Properties (6)

additional_info
SC359701
custom_field_two
2
customer
LACSD
datetime
2018-06-19T03:39:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false