Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2018, 10:27 AM
  • B 0463_B 0462 _18062018_033920.mp4

Date
06/18/2018
W/O
706863
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00094
PipeID
P08976
Time
3:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5733
Sewer Name
B JOINT OUTFALL B - UNIT 5D
City
PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_706863_TV16037_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
B 0463
Downstream MH
B 0462
Dir. of Survey
Downstream
Length Surveyed
169.3 ft.
Total Length
169.3 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
99
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
103
Pipe schematic from manhole B 0463 to B 0462
MH: B 0463MH: B 0462downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04630 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start167.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish167.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish169.3 ft. AMH - Downstream Manhole, Survey Ends - B 0462169.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 4 O'CLOCK169.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWL
167.8DAGS
169.3AMHB 0462
167.8SAP
2DAGS
169.3MGOACTIVE CONNECTION AT MH 4 O'CLOCK
0AMHB 0463
0MWM
169.3MGOCOCKROACHES IN MANHOLE
2SAP

Properties (6)

additional_info
SC359399
custom_field_two
2
customer
LACSD
datetime
2018-06-18T03:27:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false