Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 19, 2018, 11:03 AM
  • B 0884_B 0465 _19062018_040813.mp4

Date
06/19/2018
W/O
706863
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00094
PipeID
P08979
Time
4:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5735
Sewer Name
B JOINT OUTFALL B - UNIT 5D
City
PASADENA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Routine Assessment
Project
WO_706863_TV16037_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0465
Downstream MH
B 0884
Dir. of Survey
Upstream
Length Surveyed
34.9 ft.
Total Length
34.9 ft.
Structural Index
3
Structural Quick
3626
Structural Rating
30
O&M Index
2
O&M Quick
4126
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
46
Pipe schematic from manhole B 0465 to B 0884
MH: B 0465MH: B 0884upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 08841.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish32.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start32.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start34.9 ft. MWL - Water Level, 15 %of cross sectional area34.9 ft. MWM - Water Mark, 50 %of cross sectional area34.9 ft. AMH - Downstream Manhole, Survey Begins - B 0465

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
33.4DAGS
0MWL
34.9AMHB 0884
0MWM
0AMHB 0465
33.4SSS
2SSS
2SAP
33.4SAP
2DAGS

Properties (6)

additional_info
SC359701
custom_field_two
2
customer
LACSD
datetime
2018-06-19T04:03:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false