Section#1_15 0674_15 0673__7262018__I0041.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE
28.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
40.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE MODERATE AGG ATTACHED
72.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE AGG ATTCHED
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | MH CONN ACTIVE 3:00 |
| 145.5 | SSS | FLAKING CONCRETE |
| 2 | SAP | SEVERE AGG SPORATIC |
| 145.5 | MGO | MH CONN 9:00 ACTIVE |
| 28.7 | SSS | PEELING CONCRETE |
| 0 | MWL | — |
| 0 | AMH | 12:40AM |
| 40.7 | SSS | PEELING CONCRETE MODERATE AGG ATTACHED |
| 145.8 | AMH | 1:05AM |
| 2 | SAP | MODERATE AGG |
| 145.5 | SSS | PEELING CONCRETE MODERATE AGG ATTCHED |
| 0 | MWM | — |
| 145.5 | SAP | SEVERE AGG SPORATIC |
| 72.4 | SSS | PEELING CONCRETE AGG ATTCHED |
| 145.5 | SAP | MODERATE AGG |
| 2 | SSS | FLAKING CONCRETE |