Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2018, 06:26 PM
  • 05 1199_05 1198_7232018_112849.mp4

Date
07/23/2018
W/O
0717904
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00514
PipeID
P06439
Time
11:26 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7764
Sewer Name
05 ROSECRANS AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
20180723DF_ROSECRANS_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
7.480000019073486 in.
Upstream MH
05 1199
Downstream MH
05 1198
Dir. of Survey
Downstream
Length Surveyed
143.6 ft.
Total Length
143.6 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 05 1199 to 05 1198
MH: 05 1199MH: 05 1198downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:27 AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. CAPPED0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% LINER46.2 ft. MGP - General Photograph52.4 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40%GREASE/ LATERAL80 ft. MGP - General Photograph93.5 ft. MGP - General Photograph103.4 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"139.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% LINER139.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish143.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped143.6 ft. AMH - Downstream Manhole, Survey Ends - 11:45 AM143.6 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% LINER

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% LINER

  • General Photograph

    46.2 ft. - General Photograph

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40%GREASE/ LATERAL

    52.4 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40%GREASE/ LATERAL

  • General Photograph

    80 ft. - General Photograph

  • General Photograph

    93.5 ft. - General Photograph

Observations (16)

DistanceCodeObservation
143.6MGOConn. @ Mh, 9 O' Clock. Capped
2SSS
2SZ70% LINER
139.7SZ70% LINER
80MGP
93.5MGP
0MWM
139.7SSS
0AMH11:27 AM
143.6AMH11:45 AM
52.4TFDOpen/40%GREASE/ LATERAL
143.6MGOGREASE THROUGHOUT THE REACH (5%)
103.4TFA
46.2MGP
0MGOConn. @ Mh, 3 O' Clock. CAPPED
0MWL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-07-23T11:26:57-07:00
documentation
FRANKLIN, IGNACIO, PARAISO
is_lateral_inspection
false