Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2021, 11:22 AM
  • 18 0215_18 0214_01142021_033129.mp4

Date
01/14/2021
W/O
865104
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00695
PipeID
P14041
Time
3:22 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8421
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_865104_TV18100_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0215
Downstream MH
18 0214
Dir. of Survey
Downstream
Length Surveyed
27.4 ft.
Total Length
27.4 ft.
Structural Index
4
Structural Quick
5535
Structural Rating
40
O&M Index
2
O&M Quick
4125
O&M Rating
14
Overall Index
3
Overall Quick
Overall Rating
54
Pipe schematic from manhole 18 0215 to 18 0214
MH: 18 0215MH: 18 0214downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 18 02152 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start25.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish25.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish25.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish27.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK27.4 ft. AMH - Downstream Manhole, Survey Ends - 18 021427.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    27.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
25.1SAP
0MWL
25.1DAGS
25.1SRV
27.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2DAGS
0MWM
27.4AMH18 0214
2SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH18 0215
2SRV
27.4MGOCOCKROACHES IN MANHOLE

Properties (7)

additional_info
630069011321203
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-01-14T03:22:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false