Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 22, 2021, 05:58 AM
  • 18 0125_18 0124_01212021_222548.mp4

Date
01/21/2021
W/O
865104
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00695
PipeID
P13946
Time
9:58 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8426
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_865104_TV18100_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
18 0125
Downstream MH
18 0124
Dir. of Survey
Downstream
Length Surveyed
73.4 ft.
Total Length
73.4 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
55
O&M Index
2
O&M Quick
412B
O&M Rating
32
Overall Index
2
Overall Quick
Overall Rating
87
Pipe schematic from manhole 18 0125 to 18 0124
MH: 18 0125MH: 18 0124downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 01250 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start73.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish73.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish73.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish73.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0124

Observation photos (4)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    15.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
73.3SSS
15.9SSS
0AMH18 0125
2MGOMAG COATING THROUGHOUT
15.9SAP
2DAGS
0MWM
0MWL
73.3DAGS
73.4AMH18 0124
73.3SAP

Properties (7)

additional_info
630069012121201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer