Section#2_02 2090_02 2089__3292018__G6983.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Broken, from 02 to 04 o'clock, within 8 inches of joint: YES
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
2 ft. - General Photograph
4.9 ft. - General Photograph - POSSIBLE PINCHED GASKET
32.4 ft. - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - OPEN
111.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
114.7 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start
117.6 ft. - Survey Abandoned - HIGH WATER/DEBRIS/SAG
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | — |
| 117.6 | MSA | HIGH WATER/DEBRIS/SAG |
| 114.7 | MWLS | — |
| 117.6 | MWLS | — |
| 4.9 | MGP | POSSIBLE PINCHED GASKET |
| 111.5 | DAGS | — |
| 109.1 | TF | OPEN |
| 0 | AMH | 10:14 AM |
| 0 | MWM | — |
| 2 | B | — |
| 0 | MWL | — |
| 2 | CM | — |
| 117.6 | SSS | — |
| 2 | MGP | — |
| 32.4 | TF | OPEN |