Wastewater/Activity/PacpInspection/1.0Mar 13, 2018, 08:18 AM
  • 05 1095_05 1094_13032018_013310.mp4

Date
03/13/2018
W/O
690188
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00488
PipeID
P06329
Time
1:18 AM
Certificate
U-11-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5482
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
WO_690188_TV05328_MAR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
05 1095
Downstream MH
05 1094
Dir. of Survey
Downstream
Length Surveyed
324.3 ft.
Total Length
324.3 ft.
Structural Index
4
Structural Quick
5141
Structural Rating
18
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
24
Pipe schematic from manhole 05 1095 to 05 1094
MH: 05 1095MH: 05 1094downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 10950 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES5.2 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES20.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start48.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"59.5 ft. FS - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES149.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"194 ft. B - Broken, from 12 to 03 o'clock, within 8 inches of joint: YES194.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES247 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"322 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.3 ft. AMH - Downstream Manhole, Survey Ends - 05 1094

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    5.2 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    59.5 ft. - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    194.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
59.5FS
0AMH05 1095
194.2FM
5.2CM
149.1TFA
194B
322CM
247TFC
48.3TFC
0MWM
324.3AMH05 1094
20.3CM
0MWL
2DAGS

Properties (6)

additional_info
SC358488
custom_field_two
2
customer
LACSD
datetime
2018-03-13T01:18:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false