Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 13, 2018, 05:49 AM
  • 01 0539_01 0538A_12032018_230555.mp4

Date
03/12/2018
W/O
690113
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00206
PipeID
P01027
Time
10:49 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5481
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_690113_TV01232_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0539
Downstream MH
01 0538A
Dir. of Survey
Downstream
Length Surveyed
250.8 ft.
Total Length
250.8 ft.
Structural Index
3
Structural Quick
3S00
Structural Rating
294
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
294
Pipe schematic from manhole 01 0539 to 01 0538A
MH: 01 0539MH: 01 0538Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 05390 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"41.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"67.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"80.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"97.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"131.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"139.4 ft. RPP - Repair Patch, from 09 to 01 o'clock, within 8 inches of joint: YES164 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"166.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"202.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"241.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"243.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"248.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish248.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE248.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.8 ft. AMH - Downstream Manhole, Survey Ends - 01 0538A

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Repair Patch, from 09 to 01 o'clock, within 8 inches of joint: YES

    139.4 ft. - Repair Patch, from 09 to 01 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
0AMH01 0539
131.6TF
67.5TFA
41.9TFC
202.4TF
166.1TFA
241.2TFC
243.6TF
0MWL
248.4CM
4.8CM
164TFC
97.7TFC
16.4TFC
248.4MGOCOCKROACHES IN MANHOLE
248.4SAP
139.4RPP
250.8AMH01 0538A
80.3TFC
2SAP

Properties (6)

additional_info
SC358487
custom_field_two
2
customer
LACSD
datetime
2018-03-12T22:49:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false