Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 24, 2018, 07:54 AM
  • 21 0927_21 0926_3242018_012545.mp4

Date
03/24/2018
W/O
0696468
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00760
PipeID
P16015
Time
12:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0788
Sewer Name
21 CLAREMONT OUTFALL TRUNK
City
MONTCLAIR
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
10
Purpose
Routine Assessment
Project
20180324MDM_CLAREMONT_OUTFALL_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
21 0927
Downstream MH
21 0926
Dir. of Survey
Downstream
Length Surveyed
109.6 ft.
Total Length
109.6 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole 21 0927 to 21 0926
MH: 21 0927MH: 21 0926downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM2 ft. MCU - Camera Underwater7.4 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area9.8 ft. MGO - General Observation - CAMERA ABOVE WATER15.5 ft. MWM - Water Mark, 80 %of cross sectional area15.5 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area100.1 ft. MWL - Water Level, 20 %of cross sectional area100.7 ft. MGO - General Observation - 15: NRCP - CIPP109.6 ft. AMH - Downstream Manhole, Survey Ends - 1:20AM

Observation photos (2)

  • Water Level, Sag in pipe, 40 %of cross sectional area

    15.5 ft. - Water Level, Sag in pipe, 40 %of cross sectional area

  • General Observation - 15: NRCP - CIPP

    100.7 ft. - General Observation - 15: NRCP - CIPP

Observations (12)

DistanceCodeObservation
7.4MWLS
9.8MGOCAMERA ABOVE WATER
109.6AMH1:20AM
15.5MWM
100.7MGO15: NRCP - CIPP
100.1MWL
0MWM
0MWL
15.5MWLS
0MGOMH CONN 3:00 OPEN
2MCU
0AMH12:55AM

Properties (7)

custom_field_three
CIPP LINER GOOD COND -40% SAG
custom_field_two
4
customer
LACSD
datetime
2018-03-24T00:54:08-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false
lining
CIPP